Datasets:
The full dataset viewer is not available (click to read why). Only showing a preview of the rows.
Error code: DatasetGenerationError
Exception: TypeError
Message: Couldn't cast array of type
struct<usage_action: string, impact_label: string, usage_summary: string, year: string, specific_vehicules: string>
to
{'usage_action': Value('string'), 'impact_label': Value('string'), 'usage_summary': Value('string')}
Traceback: Traceback (most recent call last):
File "/usr/local/lib/python3.14/site-packages/datasets/builder.py", line 1827, in _prepare_split_single
for key, table in generator:
^^^^^^^^^
File "/src/services/worker/src/worker/job_runners/config/parquet_and_info.py", line 613, in wrapped
for item in generator(*args, **kwargs):
~~~~~~~~~^^^^^^^^^^^^^^^^^
File "/usr/local/lib/python3.14/site-packages/datasets/packaged_modules/json/json.py", line 343, in _generate_tables
self._cast_table(pa_table, json_field_paths=json_field_paths),
~~~~~~~~~~~~~~~~^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
File "/usr/local/lib/python3.14/site-packages/datasets/packaged_modules/json/json.py", line 132, in _cast_table
pa_table = table_cast(pa_table, self.info.features.arrow_schema)
File "/usr/local/lib/python3.14/site-packages/datasets/table.py", line 2378, in table_cast
return cast_table_to_schema(table, schema)
File "/usr/local/lib/python3.14/site-packages/datasets/table.py", line 2312, in cast_table_to_schema
cast_array_to_feature(
~~~~~~~~~~~~~~~~~~~~~^
table[name] if name in table_column_names else pa.array([None] * len(table), type=schema.field(name).type),
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
feature,
^^^^^^^^
)
^
File "/usr/local/lib/python3.14/site-packages/datasets/table.py", line 1861, in wrapper
return pa.chunked_array([func(chunk, *args, **kwargs) for chunk in array.chunks])
~~~~^^^^^^^^^^^^^^^^^^^^^^^^
File "/usr/local/lib/python3.14/site-packages/datasets/table.py", line 2118, in cast_array_to_feature
casted_array_values = _c(array.values, feature.feature)
File "/usr/local/lib/python3.14/site-packages/datasets/table.py", line 1863, in wrapper
return func(array, *args, **kwargs)
File "/usr/local/lib/python3.14/site-packages/datasets/table.py", line 2068, in cast_array_to_feature
_c(array.field(name) if name in array_fields else null_array, subfeature)
~~^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
File "/usr/local/lib/python3.14/site-packages/datasets/table.py", line 1863, in wrapper
return func(array, *args, **kwargs)
File "/usr/local/lib/python3.14/site-packages/datasets/table.py", line 2158, in cast_array_to_feature
raise TypeError(f"Couldn't cast array of type\n{_short_str(array.type)}\nto\n{_short_str(feature)}")
TypeError: Couldn't cast array of type
struct<usage_action: string, impact_label: string, usage_summary: string, year: string, specific_vehicules: string>
to
{'usage_action': Value('string'), 'impact_label': Value('string'), 'usage_summary': Value('string')}
The above exception was the direct cause of the following exception:
Traceback (most recent call last):
File "/src/services/worker/src/worker/job_runners/config/parquet_and_info.py", line 1369, in compute_config_parquet_and_info_response
parquet_operations, partial, estimated_dataset_info = stream_convert_to_parquet(
~~~~~~~~~~~~~~~~~~~~~~~~~^
builder, max_dataset_size_bytes=max_dataset_size_bytes
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
)
^
File "/src/services/worker/src/worker/job_runners/config/parquet_and_info.py", line 948, in stream_convert_to_parquet
builder._prepare_split(split_generator=splits_generators[split], file_format="parquet")
~~~~~~~~~~~~~~~~~~~~~~^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
File "/usr/local/lib/python3.14/site-packages/datasets/builder.py", line 1694, in _prepare_split
for job_id, done, content in self._prepare_split_single(
~~~~~~~~~~~~~~~~~~~~~~~~~~^
gen_kwargs=gen_kwargs, job_id=job_id, **_prepare_split_args
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
):
^
File "/usr/local/lib/python3.14/site-packages/datasets/builder.py", line 1880, in _prepare_split_single
raise DatasetGenerationError("An error occurred while generating the dataset") from e
datasets.exceptions.DatasetGenerationError: An error occurred while generating the datasetNeed help to make the dataset viewer work? Make sure to review how to configure the dataset viewer, and open a discussion for direct support.
corpus_id string | config string | pdf_url string | title string | page int64 | chunk int64 | input_text string | has_data_score float64 | project_id string | doc_id string | document_type string | document_date timestamp[s] | language string | disclosure_status string | country string | report_no null | authors null | disclosure_date null | major_sector null | sector null | topics null | themes null | region null | landing_page_url null | abstract null | report_url null | organization null | posted null | originally_published null | disaster_type null | entities list |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
fcv_pads_east_africa:006862 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099505005252216732/pdf/P1665700eab2990980ba070e586b8230768.pdf | Uganda - Eastern and Southern Africa- P166570- Uganda Secondary Education Expansion Project - Procurement Plan | 0 | 0 | # **18 MONTHS PROCUREMENT PLAN**
**Project information:** P166570 - Uganda: **Project Implementation agency:** Ministry of Education and Sports **Date of the Procurement Plan:** March 2020 **Period covered by this Procurement Plan:** 18 months
# **Preamble**
In accordance with paragraph 5.9 of the “World Bank Pro... | 1 | P166570 | 33828921 | Procurement Plan | 2022-05-24T04:00:00 | English | Disclosed | Uganda | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "Procurement Plan tables in STEP",
"label": "DATA_MENTION",
"score": 0.5926485658,
"start": 648,
"end": 679,
"provenance": {
"producer": "Ministry of Education and Sports",
"geography": "Uganda",
"acronym": "STEP",
"specificity": "named"
},
"usage_im... |
fcv_pads_east_africa:006862 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099505005252216732/pdf/P1665700eab2990980ba070e586b8230768.pdf | Uganda - Eastern and Southern Africa- P166570- Uganda Secondary Education Expansion Project - Procurement Plan | 0 | 1 | 4 of the Procurement Regulations and the following conditions:
_In accordance with paragraph 5.3 of the Procurement Regulations, the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in ... | 0 | P166570 | 33828921 | Procurement Plan | 2022-05-24T04:00:00 | English | Disclosed | Uganda | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:006862 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099505005252216732/pdf/P1665700eab2990980ba070e586b8230768.pdf | Uganda - Eastern and Southern Africa- P166570- Uganda Secondary Education Expansion Project - Procurement Plan | 1 | 0 | **_Domestic preference_** _as specified under paragraph 5.51_ of the Procurement Regulations **_(Goods and Works)_** .
Goods : **Applicable for those contracts identified in the Procurement Plan tables**
Works: **applicable for those contracts identified in the Procurement Plan tables**
# **Other Relevant Procure... | 0 | P166570 | 33828921 | Procurement Plan | 2022-05-24T04:00:00 | English | Disclosed | Uganda | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:006862 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099505005252216732/pdf/P1665700eab2990980ba070e586b8230768.pdf | Uganda - Eastern and Southern Africa- P166570- Uganda Secondary Education Expansion Project - Procurement Plan | 1 | 1 | and<br>|C ≥ 2,000,000|Open Competition International<br>Market Approach|
|2|non-<br>consulting<br>services|100,000 < C <<br>2,000,000|Open Competition National Market<br>Approach|
|||C≤ 100,000|RfQ|
|3|selection of<br>consultant<br>firms|C < 300,000|Open Competition International<br>Market Approach|
|4|Selection of<br... | 0 | P166570 | 33828921 | Procurement Plan | 2022-05-24T04:00:00 | English | Disclosed | Uganda | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:006862 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099505005252216732/pdf/P1665700eab2990980ba070e586b8230768.pdf | Uganda - Eastern and Southern Africa- P166570- Uganda Secondary Education Expansion Project - Procurement Plan | 2 | 0 | |**No**|**Expenditure**<br>**Category**|**Contract (C)**<br>**Value**<br>**Threshold* [eq.**<br>**USD]**|**Procurement Method**|
|---|---|---|---|
|6|Training,<br>Workshops,<br>Study Tours|All Values|Based on approved Annual Work<br>Plan & Budgets (AWPB) by TTL|
* All contracts not subject to prior review will be po... | 0 | P166570 | 33828921 | Procurement Plan | 2022-05-24T04:00:00 | English | Disclosed | Uganda | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:006862 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099505005252216732/pdf/P1665700eab2990980ba070e586b8230768.pdf | Uganda - Eastern and Southern Africa- P166570- Uganda Secondary Education Expansion Project - Procurement Plan | 2 | 1 | for any works or goods packages in the procurement plan.
# **Proposed Procedures for CDD Components: Not Applicable**
**Reference to (if any) Project Operational/Procurement Manual:** the IWMDP team will prepare a Procurement manuals, which will also be part of the Project Implementation Manual.
**Any Other Spe... | 0 | P166570 | 33828921 | Procurement Plan | 2022-05-24T04:00:00 | English | Disclosed | Uganda | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:006862 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099505005252216732/pdf/P1665700eab2990980ba070e586b8230768.pdf | Uganda - Eastern and Southern Africa- P166570- Uganda Secondary Education Expansion Project - Procurement Plan | 3 | 0 | # **Appendix 1**
# **Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework**
Date:
Invitation of Bids/Proposals No.__________
To: ___________________________________________________________________________
We, along with our sub-contractors, sub-consultants, service prov... | 0 | P166570 | 33828921 | Procurement Plan | 2022-05-24T04:00:00 | English | Disclosed | Uganda | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:006862 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099505005252216732/pdf/P1665700eab2990980ba070e586b8230768.pdf | Uganda - Eastern and Southern Africa- P166570- Uganda Secondary Education Expansion Project - Procurement Plan | 4 | 0 | imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we... | 0 | P166570 | 33828921 | Procurement Plan | 2022-05-24T04:00:00 | English | Disclosed | Uganda | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:006862 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099505005252216732/pdf/P1665700eab2990980ba070e586b8230768.pdf | Uganda - Eastern and Southern Africa- P166570- Uganda Secondary Education Expansion Project - Procurement Plan | 4 | 1 | . completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures;
- b. cross-debarment as agreed with other international financial institutions (including multilateral development banks);
> 2 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contr... | 0 | P166570 | 33828921 | Procurement Plan | 2022-05-24T04:00:00 | English | Disclosed | Uganda | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:006862 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099505005252216732/pdf/P1665700eab2990980ba070e586b8230768.pdf | Uganda - Eastern and Southern Africa- P166570- Uganda Secondary Education Expansion Project - Procurement Plan | 5 | 0 | - c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or
- d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding.
For avoidance of do... | 1 | P166570 | 33828921 | Procurement Plan | 2022-05-24T04:00:00 | English | Disclosed | Uganda | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "financial records and information",
"label": "DATA_MENTION",
"score": 0.9226228595,
"start": 1790,
"end": 1823,
"provenance": {
"producer": "World Bank Group",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "validate",
"impact_lab... |
fcv_pads_east_africa:006862 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099505005252216732/pdf/P1665700eab2990980ba070e586b8230768.pdf | Uganda - Eastern and Southern Africa- P166570- Uganda Secondary Education Expansion Project - Procurement Plan | 5 | 1 | mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the inve... | 1 | P166570 | 33828921 | Procurement Plan | 2022-05-24T04:00:00 | English | Disclosed | Uganda | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "financial records and information",
"label": "DATA_MENTION",
"score": 0.9116723537,
"start": 107,
"end": 140,
"provenance": {
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "analyze",
"impact_label": "evidence-base",
"usage_summar... |
fcv_pads_east_africa:006862 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099505005252216732/pdf/P1665700eab2990980ba070e586b8230768.pdf | Uganda - Eastern and Southern Africa- P166570- Uganda Secondary Education Expansion Project - Procurement Plan | 6 | 0 | |**PROCUREMENT**<br>**PLAN**|**Uganda :**|**Uganda Secondar**|**y Education E**|**xpansion P**|**roject**||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|**General Informa**<br>**Country:**<br>**Project ID:**<br>**Project Name:**<br>**Loan / Credit No:**<br>**Execu... | 0 | P166570 | 33828921 | Procurement Plan | 2022-05-24T04:00:00 | English | Disclosed | Uganda | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:006862 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099505005252216732/pdf/P1665700eab2990980ba070e586b8230768.pdf | Uganda - Eastern and Southern Africa- P166570- Uganda Secondary Education Expansion Project - Procurement Plan | 6 | 1 | Revised Plan D**<br>**GPN Date:**<br>nsion Project<br>Review Type|**al Date of th**<br>**ate(s): (com**<br>Method|**e Original Procurement Plan**2<br>**ma delineated, leave blank**2<br>2<br>Market Approac<br>h<br>Procurement Pro<br>cess<br>Pr|020-12-15<br>022-05-25<br>020-12-03<br>equalification<br>(Y/N)<br>H|igh SEA/S... | 0 | P166570 | 33828921 | Procurement Plan | 2022-05-24T04:00:00 | English | Disclosed | Uganda | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:006862 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099505005252216732/pdf/P1665700eab2990980ba070e586b8230768.pdf | Uganda - Eastern and Southern Africa- P166570- Uganda Secondary Education Expansion Project - Procurement Plan | 6 | 2 | >B<br>a<br>Planned<br>Actual<br>|id Evalu<br>nd Reco<br>for<br>Planned|ation Report<br>mmendation<br>Award<br>Signed Contract<br>C<br>Actual<br>Planned<br>Actual<br>|ontract Complet<br>ion<br>Planned<br>Actual|
|**GOODS**<br>Activity Reference No. /<br>Description|Loan / Credit N<br>o.|<br>Component|Review Type|Method|... | 0 | P166570 | 33828921 | Procurement Plan | 2022-05-24T04:00:00 | English | Disclosed | Uganda | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:006862 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099505005252216732/pdf/P1665700eab2990980ba070e586b8230768.pdf | Uganda - Eastern and Southern Africa- P166570- Uganda Secondary Education Expansion Project - Procurement Plan | 6 | 3 | lann|al Submission /<br>ing / Minutes<br> <br>ed<br>Actual|Bid Evaluation Report<br>and Recommendation<br>for Award<br>Planned<br>Actual<br>|Signed<br>Planned|Contract<br>Contract Completion<br>Actual<br>Planned<br>Actual||
|UG-MOES-226166-GO-RFB /|||||||||||||||||||||
|Procurement of 1300 Laptop<br>s and 1300 Projecto... | 0 | P166570 | 33828921 | Procurement Plan | 2022-05-24T04:00:00 | English | Disclosed | Uganda | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:006862 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099505005252216732/pdf/P1665700eab2990980ba070e586b8230768.pdf | Uganda - Eastern and Southern Africa- P166570- Uganda Secondary Education Expansion Project - Procurement Plan | 6 | 4 | br>Description|Loan / Credit N<br>o.|<br>Component|Review Type|Method|Market Approac<br>h<br>Procurement Pro<br>cess<br>Pr|equalification<br>(Y/N)<br>A|ctual Amoun<br>(US$)|<br>Process St<br>atus<br>Draft Pre-<br>Docu|qualifica<br>ments|ion|Prequalification Evalu<br>ation Report<br>|Draft Bidding Docum<br>ent / Justifi... | 0 | P166570 | 33828921 | Procurement Plan | 2022-05-24T04:00:00 | English | Disclosed | Uganda | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:006862 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099505005252216732/pdf/P1665700eab2990980ba070e586b8230768.pdf | Uganda - Eastern and Southern Africa- P166570- Uganda Secondary Education Expansion Project - Procurement Plan | 6 | 5 | br>|Direct Selection|Direct||0.00|Canceled||||2021-02-19|2021-03-12||||2|021-04-30|2021-10-27||
|**CONSULTING FIRM**<br>Activity Reference No. /<br>Description|**S**<br>Loan / Credit N<br>o.|<br>Component|Review Type|Method|Market Approac<br>h<br>Contract Type<br>A|ctual Amount<br>(US$)<br>P|rocess Status|<br>Terms of ... | 0 | P166570 | 33828921 | Procurement Plan | 2022-05-24T04:00:00 | English | Disclosed | Uganda | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:006862 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099505005252216732/pdf/P1665700eab2990980ba070e586b8230768.pdf | Uganda - Eastern and Southern Africa- P166570- Uganda Secondary Education Expansion Project - Procurement Plan | 6 | 6 | |Contract Completion<br><br>||
|UG-MOES-226172-CS-CQS /||||||||Planned<br>Actual|Plann|ed|Actual<br>Planned|Actual<br>Planned|Actual<br>Planned|Actual<br>Planned<br>|Actu|al<br>Planned|Actual<br>Planned|Actual|Planned<br>Actual||
|<br>Consultancy services (firm) f<br>or the development of the Na<br>tional Teacher Reten... | 0 | P166570 | 33828921 | Procurement Plan | 2022-05-24T04:00:00 | English | Disclosed | Uganda | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:006862 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099505005252216732/pdf/P1665700eab2990980ba070e586b8230768.pdf | Uganda - Eastern and Southern Africa- P166570- Uganda Secondary Education Expansion Project - Procurement Plan | 6 | 7 | <br>at|nder Implement<br>ion|<br>2021-06-14<br>2021-11-30|||2021-06-28|||||2021-07-28|2021-09-01||2022-02-28||
|UG-MOES-206733-CS-QCBS /<br>Consultancy for independent<br>verification of project results<br>(DLI)|IDA / D7010|Project Management, Monito<br>ring and Evaluation|Post<br> <br>|Consultant Qualifi<br>cation Se... | 0 | P166570 | 33828921 | Procurement Plan | 2022-05-24T04:00:00 | English | Disclosed | Uganda | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:006862 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099505005252216732/pdf/P1665700eab2990980ba070e586b8230768.pdf | Uganda - Eastern and Southern Africa- P166570- Uganda Secondary Education Expansion Project - Procurement Plan | 6 | 8 | ||2021-06-21|||||2021-07-21|2021-08-25||2022-02-21||
|UG-MOES-257846-CS-CQS /<br>Consultancy services to deve<br>lop, design and produce mat<br>erials into digitalized adapta<br>ble materials for specials nee<br>ds students|IDA / D7010|Hosting Community and Ref<br>ugee Education Support|Post<br> <br>|Consultant Qualifi... | 0 | P166570 | 33828921 | Procurement Plan | 2022-05-24T04:00:00 | English | Disclosed | Uganda | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:006862 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099505005252216732/pdf/P1665700eab2990980ba070e586b8230768.pdf | Uganda - Eastern and Southern Africa- P166570- Uganda Secondary Education Expansion Project - Procurement Plan | 6 | 9 | )|||||||||||||||||||||
|**INDIVIDUAL CONSU**<br>Activity Reference No. /<br>Description|**LTANTS**<br>Loan / Credit N<br>o.|<br>Component|Review Type|Method|Market Approac<br>h<br>Contract Type<br>A|ctual Amount<br>(US$)<br>P|rocess Status|<br>Teams of Reference<br>Planned<br>Actual|Invitat<br>d/Selec<br>Plann|ion t<br... | 0 | P166570 | 33828921 | Procurement Plan | 2022-05-24T04:00:00 | English | Disclosed | Uganda | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:006862 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099505005252216732/pdf/P1665700eab2990980ba070e586b8230768.pdf | Uganda - Eastern and Southern Africa- P166570- Uganda Secondary Education Expansion Project - Procurement Plan | 6 | 10 | 02-19|2021-04|-09|2021-04-30|2021-06-04|2022-12-04||||||||
|UG-MOES-209502-CS-INDV /<br>Recruitment of a Monitoring<br>and Evaluation Specialist for<br>2years|IDA / D7010|Project Management, Monito<br>ring and Evaluation|Prior<br> <br>|Individual Consult<br>ant Selection|Open|0.00<br>U<br>at|nder Implement<br>ion|<br>2... | 0 | P166570 | 33828921 | Procurement Plan | 2022-05-24T04:00:00 | English | Disclosed | Uganda | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:006862 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099505005252216732/pdf/P1665700eab2990980ba070e586b8230768.pdf | Uganda - Eastern and Southern Africa- P166570- Uganda Secondary Education Expansion Project - Procurement Plan | 6 | 11 | ||||
|UG-MOES-209519-CS-INDV /<br>Recruitment of a Social Devel<br>opment Specialist for 2 years<br>under USEEIP|<br>IDA / D7010|Project Management, Monito<br>ring and Evaluation|Prior<br> <br>|Individual Consult<br>ant Selection|Open|0.00<br>U<br>at|nder Implement<br>ion|<br>2021-02-19<br>2022-03-17|2021-04|-09|2021-0... | 0 | P166570 | 33828921 | Procurement Plan | 2022-05-24T04:00:00 | English | Disclosed | Uganda | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:006862 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099505005252216732/pdf/P1665700eab2990980ba070e586b8230768.pdf | Uganda - Eastern and Southern Africa- P166570- Uganda Secondary Education Expansion Project - Procurement Plan | 7 | 0 | <!-- Start of picture text -->
UG-MOES-209484-CS-CDS /<br>Recruitment of Ms. Irene AolPollicky Procurement Speciali IDA / D7010 Project Management, Monitoring and Evaluation Prior Direct Selection Direct 0.00 Under Implementation 2021-03-24 2022-03-21 2021-04-03 2021-06-07 2022-12-07<br>st under USEEIP for 2 years<br>... | 0 | P166570 | 33828921 | Procurement Plan | 2022-05-24T04:00:00 | English | Disclosed | Uganda | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:006862 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099505005252216732/pdf/P1665700eab2990980ba070e586b8230768.pdf | Uganda - Eastern and Southern Africa- P166570- Uganda Secondary Education Expansion Project - Procurement Plan | 7 | 1 | >on Policy<br> UG-MOES-209480-CS-CDS /<br>Recruitment of Ms. Jane Frances Nansamba as Deputy Pro IDA / D7010 Project Management, Monitoring and Evaluation Post Direct Selection Direct 0.00 Canceled 2021-03-24 2021-04-03 2021-06-07 2022-12-07<br>ject Coordinator for USEEP fo<br>r 2 years<br> UG-MOES-290579-CS-INDV /<br>... | 0 | P166570 | 33828921 | Procurement Plan | 2022-05-24T04:00:00 | English | Disclosed | Uganda | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:006862 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099505005252216732/pdf/P1665700eab2990980ba070e586b8230768.pdf | Uganda - Eastern and Southern Africa- P166570- Uganda Secondary Education Expansion Project - Procurement Plan | 7 | 2 | under USEEIP<br> UG-MOES-296513-CS-CDS /<br>Recruitment of Mr. Alex Winyi Kiiza as Environmental Safe IDA / 67540 Project Management, Monitoring and Evaluation Post Direct Selection Direct 0.00 Pending Implementation 2022-05-29 2022-06-08 2022-08-12 2023-02-08<br>guards Specialist under USEE<br>P for two years<br><!--... | 0 | P166570 | 33828921 | Procurement Plan | 2022-05-24T04:00:00 | English | Disclosed | Uganda | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 0 | 0 | # **Procurement Plan for ETLP (P156590)**
## **I.** **<u>General</u>**
**_1._ Bank’s approval Date of the procurement Plan** [Original: January 2017 _: Revision 1 of Updated Procurement Plan, March 2017]_
2. **Date of General Procurement Notice** : January 2017
_3._ **Period covered by this procurement plan** :... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 0 | 1 | )|_Above US$ 1.5_<br>_Million_|_All_|
**2. Prequalification** . Bidders shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines.
**3. Reference to (if any) Project Operational/Procurement Manual:** Project Implementation Manual for World Bank Loan Project P156590 as iss... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 1 | 0 | ### financing and advanced procurement)
|**1**|**2**|**3**|**4**|**5**|**6**|**7**|
|---|---|---|---|---|---|---|
|**Ref.**<br>**No.**|**Description**|**Estimated**<br>**Cost**<br>**US$ million**|**Packages**|**Domestic**<br>**Preference**<br>**(yes/no)**|**Review**<br>**by Bank**<br>**(Prior /**<br>**Post)**|**Comme... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 1 | 1 | *|**Prior Review**<br>**Threshold**|**Comments**|
|---|---|---|---|
|1.|Competitive Methods<br>(Firms)|Above US$ 500,000||
|2.|Single Source (Firms)|All||
|3.|Individual|Above US$ 200,000||
**2. Short list comprising entirely of national consultants** : Short list of consultants for services, estimated to cost less ... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 2 | 0 | |**Description of**<br>**Assignment**|**Cost**<br>US$ million|**Package**<br>**s**|**by Bank**<br>**(Prior / Post)**|
|---|---|---|---|
|Summary of number<br>of contracts that will<br>be let under QCBS|_$_<br>_1.35_|<br>_3_|_Prior_|
|Summary of number<br>of contracts that will<br>be let under other<br>methods|_$_<br>_0... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 3 | 0 | **PROCUREMENTPLAN Ethiopia : Ethiopia Trade Logistics Project** **<mark>General Information</mark> Country:** Ethiopia **Bank’s Approval Date of the Original Procurement Plan:** 2017-01-16 **Revised Plan Date(s): (comma delineated, leave blank if non** 2021-02-08 **Project ID:** P156590 **GPN Date: Project Name:** Ethi... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 3 | 1 | br>Justification<br>Planned<br>Actual|Specific Procuremen<br>Notice / Invitation<br>Planned<br>Actual|t<br>Bidding Docum<br>Issued<br>Planned<br>A|ents as<br>Proposal Submission<br>Opening / Minutes<br>ctual<br>Planned<br>Actual|/<br>Bid Evaluation Repo<br>and Recommendatio<br>for Award<br>Planned<br>Actual|rt<br>n<br>... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 3 | 2 | 07-20|2017-08-10<br>2020-07-2|1|2017-09-26<br>2020-09-2|9<br>2017-10-26|2017-12-05|2018-06-<br>03|
|.<br>**GOODS**<br>Activity Reference No. /<br>Loan / Credit||||||Procurement|Preualificati|n<br>Estimated<br>|ctual Amount<br>Process<br>Draft Pre-ualification|Preualification|Draft Bidding|Secific Procurement|Biddin Doc... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 3 | 3 | A|<br>nutes<br>and Recommendation<br>for Award<br>ctual<br>Planned<br>Actual|<br>Signed Contract<br>Planned<br>Actual|Contract Completion<br><br>Planned<br>Actual||
|ET-EMAA-4947-GO-RFB /|||||||||||||||||||
|Procurement of Different<br>Types Port Machineries and<br>Equipment.<br>/|Improvement of<br>infrastructure at Mo... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 3 | 4 | <br>Envelope||10,175,000.00|0.00<br>Pending<br>Implementati<br>on||2017-01-30|2017-02-04||2017-03-20|2017-04-19|2017-05-24|2017-08-23||
|ET-EMAA-4949-GO-RFB /<br>Procurement of Information &<br>Communication Technology:<br>Lot 1: Software and Lot 2:<br>hardware and networking<br>infrastructure<br>/|Enhancing coordinati... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 3 | 5 | br>on|||2017-06-24<br>2017-07-12||||2017-08-12|2017-09-28||
|ET-EMAA-16895-GO-RFQ /<br>Procurement of different<br>Office Furniture<br>IDA / 59950|Regulatory and Institutional<br>Capacity Support|Post|Request for<br>Quotations|Limit|ed|Single Stage - One<br>Envelope||48,000.00|0.00<br>Pending<br>Implementati<br>on|||20... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 3 | 6 | Limit|ed|Single Stage - One<br>Envelope||45,000.00|0.00<br>Pending<br>Implementati<br>on|||2017-07-01||||2017-08-26|2017-09-28||
|ET-EMAA-19668-GO-RFQ /<br>Procurement of vehicle for<br>field works<br>IDA / V0480|Regulatory and Institutional<br>Capacity Support|Post|Request for<br>Quotations|Limit|ed|Single Stage - One... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 3 | 7 | -RFB /<br>Procurement of Firefighting<br>Truck<br>IDA / 59950|Improvement of<br>infrastructure at Modjo|Post|Request for Bids|Ope|n - National|Single Stage - One<br>Envelope||490,000.00|0.00<br>Canceled||2018-04-11|2018-04-16||2018-05-28|2018-06-27|2018-08-01|2019-01-28||
|ET-EMAA-62392-GO-RFB /<br>Procurement of Port<... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 3 | 8 | Tired<br>Gantry cranes (RTGs)<br>IDA / 59950|Improvement of<br>infrastructure at Modjo|Prior|Request for Bids|Ope|n - Internation|al<br>Single Stage - One<br>Envelope||12,000,000.00|0.00<br>Canceled||2018-06-20|2018-06-25||2018-08-06|2018-09-05|2018-10-10|2019-04-08||
|ET-EMAA-56677-GO-UN /<br>Procurement of Vehicles ... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 3 | 9 | Modjo|Prior|Request for Bids|Ope|n - Internation|al<br>Single Stage - One<br>Envelope||18,000,000.00|8,211,251.00<br>Under<br>Implementati<br>on||2019-11-30<br>2020-02-2|6<br>2020-01-14<br>2020-03-03||2020-01-24<br>202|0-05-14<br>2020-02-23<br>2020-11-1|8<br>2020-03-29|2021-01-23||
|ET-EMAA-185636-GO-RFB /<br>Procurem... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 3 | 10 | 2020-12-16|2021-01-20|2022-01-15||
|ET-EMAA-209027-GO-RFB /<br>Procurement of Vehicles: 3<br>units of High-roof, 3 units of<br>Station Wagon, 2 units of Pick<br>ups and 2 units of automobile<br>IDA / 59950|Regulatory and Institutional<br>Capacity Support|Post|Request for Bids|Ope|n - National|Single Stage - One<br>Enve... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 4 | 0 | |**NON CONSULTING S**<br>Activity Reference No. /<br>Description<br>**CONSULTING FIRMS**<br>Activit Reference No /|**ERVICES**<br>Loan / Credit<br>No.|Component|Review Type|Method|Market Approach|Procurement<br>Process|Prequalification<br>(Y/N)|Estimated<br>Amount (US$)<br>Actual Amoun<br>(US$)|t<br>Process<br>Status<b... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 4 | 1 | endation<br>Award<br>Sign<br>Actual<br>Planne|ed Contract<br>Contract Completion<br>d<br>Actual<br>Planned<br>Actual|
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|y .<br>Description|Loan / Credit<br>No.|Component|Review Type|Method|Market Approach<br>|Contract Type|Estimat... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 4 | 2 | |al<br>Planned|Actual<br>Pla|nned|Actual|Planned<br>Actual|Planned<br>Actual|<br>Planned<br>Actual|Planned<br>Actua|l<br>Planned<br>Actual|
|ET-EMAA-4950-CS-QCBS /<br>Consultancy Service for<br>feasibility study design, and<br>supervision of Construction<br>Works of Modjo Dry Port<br>Development|IDA / 59950|Improvemen... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 4 | 3 | Prior<br> <br>|Quality And Cost-<br>Based Selection|Open - National||650,000.00|0.00<br>Canceled|2017-02-01||2017-02-22||2017-04-07||||2017-04-27|2017-05-23|2017-06-27|2017-08-01|2017-08-31|
|ET-EMAA-4955-CS-QCBS /<br>Consultancy Service for<br>Baseline survey|/|Improvement of<br>infrastructure at Modjo|Post<br><br><br... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 4 | 4 | mentation|2017-01-24||2017-02-07||2017-03-23||||||2017-04-22|2017-05-27|2017-07-19|
|ET-EMAA-4956-CS-INDV /<br>Consultancy Service for<br>Gender Assessment|/|Improvement of<br>infrastructure at Modjo|Post<br><br><br>|Consultant<br>Qualification<br>Selection|Open - National||50,000.00|0.00<br>Pending<br>Implementation|2... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 4 | 5 | 665-CS-CQS /<br>Consultancy Service for Modjo<br>Dry Port Governance Structure<br>Study|<br> <br>IDA / 59950|Improvement of<br>infrastructure at Modjo|Post<br><br><br>|Consultant<br>Qualification<br>Selection|Open - National||150,000.00|0.00<br>Canceled|2018-04-06||2018-04-27|2018-0|4-26<br>2018-06-10||||||2018-07-10|2... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 4 | 6 | br>Design Preparation and<br>Supervision and Contract<br>Administration of Modjo<br>Logistics Hub|IDA / 59950|Improvement of<br>infrastructure at Modjo|Prior<br> <br>|Quality And Cost-<br>Based Selection|Open - International||3,000,000.00|2,564,711.59<br>Terminated|2017-02-01<br>|2018|-12-19<br>2017-02-22||2017-04-07|2... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 4 | 7 | A-4957-CS-INDV /<br>Preparation of Financial<br>Management Manual|/|Improvement of<br>infrastructure at Modjo|Post<br><br><br>|Consultant<br>Qualification<br>Selection|Open - National||30,000.00|0.00<br>Canceled|2017-01-17||2017-01-31||2017-03-02||||||2017-03-17|2017-04-14|2017-05-17|
|ET-EMAA-93125-CS-CQS /<br>Develop... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 4 | 8 | platform to other ESLSE<br>systems|<br>IDA / 59950|Enhancing coordination<br>through investments in IT<br>systems|Post<br><br><br>|Consultant<br>Qualification<br>Selection|Open - International||100,000.00|396,366.48<br>Signed|2019-04-27<br>|2019|-04-30<br>2019-05-18||2019-07-01|2019-12-05|||||2019-07-31<br>2019-12-06|2... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 4 | 9 | -31|2022-08-01|
|ET-EMAA-209418-CS-CQS /<br>PROCUREMENT OF<br>CONSULTING SERVICE FOR<br>THE STUDY AND<br>PREPARATION<br>OF ETHIOPIA’S LOGISTICS<br>MASTER PLAN|IDA / 59950|Improvement of<br>infrastructure at Modjo|Post<br><br><br>|Consultant<br>Qualification<br>Selection|Open - International||150,000.00|0.00<br>Under Re... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 5 | 0 | |**INDIVIDUAL CONSUL**<br>Activity Reference No. /<br>Description|**TANTS**<br>Loan / Credit<br>No.|Component|Review Type|Method|Market Approach<br>Contra|ct Type<br>Estimated<br>Amount (US$)<br>Ac|tual Amount<br>(US$)|Process Status|<br>Terms of|Reference|Invitat<br>Identified<br>|ion to<br>/Selected<br>|Draft<br>Co|N... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 5 | 1 | Selection|Open|50,000.00|0.00|Pending<br>Implementation|2017-01-02||2017-02-06||2017-02-2|7|2017-04-03|||2017-06-05||
|ET-EMAA-4959-CS-INDV /<br>Selection of PIU Coordinator|IDA / V0480|Regulatory and Institutional<br>Capacity Support|Post|Individual<br>Consultant<br>Selection|Open|40,000.00|0.00|Under<br>Implementatio... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 5 | 2 | <br>Consultant<br>Selection|Open|30,000.00|1,690.57|Signed|2017-01-04|2017-10-25|2017-02-15|2020-01-31|2017-03-0|1<br>2020-01-31|2017-04-05<br>20|20-|02-07|2017-10-02||
|ET-EMAA-4963-CS-INDV /<br>Selection of Safeguard Advisor|/|Regulatory and Institutional<br>Capacity Support|Post|Individual<br>Consultant<br>Selection... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 5 | 3 | ||
|ET-EMAA-4964-CS-INDV /<br>Selection of Financial<br>Management advisor (1)|/|Regulatory and Institutional<br>Capacity Support|Post|Individual<br>Consultant<br>Selection|Open|30,000.00|0.00|Under<br>Implementation|2017-01-17||2017-02-07||2017-02-2|1|2017-03-21|||2017-09-17||
|ET-EMAA-4965-CS-INDV /<br>Selection of p... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 5 | 4 | -02-22|2017-02-2|8|2017-03-28|||2017-09-24||
|ET-EMAA-5702-CS-INDV /<br>Selection of Financial<br>Management advisor (1)|IDA / V0480|Regulatory and Institutional<br>Capacity Support|Post|Individual<br>Consultant<br>Selection|Open|30,000.00|0.00|Under<br>Implementation|2017-01-17|2017-02-22|2017-02-21|2017-02-22|2017-03... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 5 | 5 | ulatory and Institutional<br>Capacity Support|Prior|Individual<br>Consultant<br>Selection|Limited|35,000.00|35,422.82|Signed|2017-12-11|2017-12-20|2017-12-16|2018-01-03|2017-12-2|3<br>2018-01-17|2018-01-06<br>20|18-|02-01|2018-07-05||
|ET-EMAA-56669-CS-INDV /<br>Selection and Employment of<br>ICT Specialist|IDA / 59950... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 5 | 6 | 1|5|2018-07-20|||2019-01-16||
|ET-EMAA-56671-CS-INDV /<br>Rail Spur ARAP and<br>Livelihoods Support and LRRP<br>implementation completion<br>review and audit|IDA / 59950|Improvement of<br>infrastructure at Modjo|Post|Individual<br>Consultant<br>Selection|Open|50,000.00|0.00|Pending<br>Implementation|2018-04-06||2018-05... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 5 | 7 | |30,000.00|0.00|Canceled|2017-07-04||||2017-09-0|8|2017-09-29|||2017-10-31||
|ET-EMAA-102932-CS-INDV<br>/ Selection and Employment<br>of ICT Consultant|IDA / 59950|Enhancing coordination<br>through investments in IT<br>systems|Post|Individual<br>Consultant<br>Selection|Open|30,000.00|0.00|Under<br>Implementation|2019-0... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 5 | 8 | Support|Prior|Individual<br>Consultant<br>Selection|Limited|35,000.00|0.00|Under<br>Implementation|2019-04-19|2019-07-10|2019-04-24|2019-07-16|2019-05-1|5<br>2019-07-25|2019-05-30|||2019-11-26||
|ET-EMAA-135351-CS-INDV<br>/ Selection of LTO Director|IDA / 59950|Regulatory and Institutional<br>Capacity Support|Post|Ind... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 5 | 9 | 06-14||
|ET-EMAA-135354-CS-INDV<br>/ Selection of Senior Customs<br>Specialist|IDA / 59950|Regulatory and Institutional<br>Capacity Support|Post|Individual<br>Consultant<br>Selection|Open|30,000.00|0.00|Under<br>Implementation|2019-09-27|2019-10-02|2019-10-31||2019-11-1|2|2019-12-17|||2020-06-14||
|ET-EMAA-135360-CS-IN... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 6 | 0 | |ET-EMAA-138802-CS-INDV<br>/ Selection & Employment of<br>LTO Deputy Director|IDA / 59950|Regulatory and Institutional<br>Capacity Support|Post|Individual<br>Consultant<br>Selection|Open|40,000.00|3,530.75|Signed|2019-10-04|2019-10-2|4<br>2019-11-12<br>201|9-1|2-16<br>2019-11-17<br>2|019-12|-16<br>2020-06-28<br>2020|-... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 6 | 1 | >2019-12-05<br>2|020-02|-12<br>2019-12-26<br>2020|-02-26|2020-01-01|
|ET-EMAA-152465-CS-INDV<br>/ Selection and Employment<br>of Contract Administration<br>Specialist|IDA / 59950|Regulatory and Institutional<br>Capacity Support|Prior|Individual<br>Consultant<br>Selection|Limited|35,000.00|0.00|Pending<br>Implementation... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 6 | 2 | 00|0.00|Canceled|2020-01-06|2020-02-2|6<br>2020-02-08||2020-02-22||2020-03-14||2020-09-10|
|ET-EMAA-154590-CS-INDV<br>/ Selection and Employment<br>of Senior Architect|IDA / 59950|Regulatory and Institutional<br>Capacity Support|Post|Individual<br>Consultant<br>Selection|Limited|10,000.00|12,599.57|Signed|2020-01-20|20... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 6 | 3 | <br>2020|-01-27|2020-02-22|
|ET-EMAA-154594-CS-INDV<br>/ Selection and Employment<br>of Senior Geo-technical<br>Engineer|IDA / 59950|Regulatory and Institutional<br>Capacity Support|Post|Individual<br>Consultant<br>Selection|Limited|6,000.00|4,724.84|Signed|2020-01-20|2020-01-1|5<br>2020-01-23<br>202|0-0|1-21<br>2020-0... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 6 | 4 | 598-CS-INDV<br>/ Selection and Employment<br>of Senior Railway Engineer|IDA / 59950|Regulatory and Institutional<br>Capacity Support|Post|Individual<br>Consultant<br>Selection|Limited|6,000.00|5,249.82|Signed|2020-01-20|2020-01-1|5<br>2020-01-23<br>202|0-0|1-21<br>2020-01-28<br>2|020-01|-27<br>2020-02-01<br>2020|-01-2... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 6 | 5 | Institutional<br>Capacity Support|Post|Individual<br>Consultant<br>Selection|Limited|8,000.00|5,512.31|Signed|2020-01-20|2020-01-1|5<br>2020-01-23<br>202|0-0|1-21<br>2020-01-28<br>2|020-01|-27<br>2020-02-01<br>2020|-01-27|2020-02-22|
|ET-EMAA-154608-CS-INDV<br>/ Selection and Employment<br>of Project Engineer to<br>su... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 6 | 6 | br>Selection|Open|30,000.00|0.00|Under<br>Implementation|2020-02-06|2020-02-2|0<br>2020-03-26||2020-04-16||2020-05-21||2020-11-17|
|ET-EMAA-158575-CS-INDV<br>/ Employment and Selection<br>of Senior Shipping Expert|IDA / 59950|Regulatory and Institutional<br>Capacity Support|Post|Individual<br>Consultant<br>Selection|Op... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 6 | 7 | 10-17|
|ET-EMAA-158580-CS-INDV<br>/ Selection and Employment<br>of Senior M & E Expert|IDA / 59950|Regulatory and Institutional<br>Capacity Support|Post|Individual<br>Consultant<br>Selection|Open|30,000.00|1,663.21|Signed|2020-02-12|2020-02-2|0<br>2020-03-23<br>202|0-0|5-21<br>2020-04-06<br>2|020-05|-21<br>2020-04-20<... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 6 | 8 | election|Open|30,000.00|0.00|Under<br>Implementation|2020-02-12|2020-02-2|0<br>2020-03-23||2020-04-06||2020-04-20||2020-10-17|
|ET-EMAA-158585-CS-INDV<br>/ Selection and Employment<br>of Maritime Lawyer|IDA / 59950|Regulatory and Institutional<br>Capacity Support|Post|Individual<br>Consultant<br>Selection|Open|30,000.0... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 6 | 9 | <br>Capacity Support|Post|Individual<br>Consultant<br>Selection|Open|24,000.00|0.00|Under<br>Implementation|2020-02-12|2020-02-2|0<br>2020-03-23||2020-04-06||2020-04-20||2020-10-17|
|ET-EMAA-158589-CS-INDV<br>/ Selection and Employment<br>of Chief Engender (Senior)|IDA / 59950|Regulatory and Institutional<br>Capacity S... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 7 | 0 | <!-- Start of picture text -->
ET-EMAA-189057-CS-INDV/ Selection and Employmentof Procurement Specialist IDA / 59950 Regulatory and InstitutionalCapacity Support Prior IndividualConsultantSelection Open 35,000.00 0.00 UnderImplementation 2020-08-27 2020-08-25 2020-10-15 2020-11-05 2020-12-10 2021-03-10<br> ET-EMAA-189... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013567 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/474851612769790577/pdf/Ethiopia-AFRICA-EAST-P156590-Ethiopia-Trade-Logistics-Project-Procurement-Plan.pdf | Ethiopia - AFRICA EAST- P156590- Ethiopia Trade Logistics Project - Procurement Plan | 7 | 1 | -11-30 2020-12-12 2021-01-16 2021-07-15<br>office<br> ET-EMAA-203396-CS-INDV<br>/ Selection and employmentof Logistics Expert forLogistics Transformation IDA / 59950 Regulatory and InstitutionalCapacity Support Post IndividualConsultantSelection Open 30,000.00 0.00 UnderImplementation 2020-11-06 2020-11-09 2020-12-10 2... | 0 | P156590 | 32813656 | Procurement Plan | 2021-02-08T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 0 | 0 | ### WEIGHTS AND MEASURES
1 Acre (ac) - 0.405 Hectares 1 Mile (mi) - 1.609 Kilometers 1 Pound (lb) - 0.453 Kilograms
### GLOSSARY OF ABBREVIATIONS
|BBF|-|Bura Building Force|
|---|---|---|
|CDC|-|Commonwealth Development Corporation|
|CLSMB|-|Cotton<br>Lint<br>and Seed Marketing<br>Board|
|EDF|-|European Developme... | 0 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 1 | 0 | <!-- Start of picture text -->
KaN onUciaL uI oNLY<br>TME WORtLD SANK<br>Washton. )D.C. 20433<br>* ~~USA.<br>Of0ice d 0wCwti<br><!-- End of picture text -->
<!-- Start of picture text -->
March 30, 1990<br><!-- End of picture text -->
<!-- Start of picture text -->
MEMORANDUM TO THE EXECUTIVE DIRECTORS A... | 0 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 2 | 0 | FOR OFFICIAL USR ONLY
PROJECT COMPLETION REPORT
BURA IRIGATION SETTLDEWNT PROJECT (CREDIT _722-XEILOAN_ 1449-XE)
# Table of Cont-nts
Pae
|PREFACE............................................|...<br>i|
|---|---|
|BASIC<br>DATA SHEET**............ **..........................**|ii|
|EVALUATIONSUMMARY<br>***...ee... | 0 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 2 | 1 | ..........**<br>3|
|III.Project Implementation<br>*****..a..........................|4|
|A. Implementation<br>Through 1984 ...................<br>B.The Kid-Term Review***.....ee...................**<br>C. Project Completion**.**<br>**......................**<br>D.PositionIn early<br>1988<br>**......................**<b... | 0 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 2 | 2 | 15<br>16|
|IV.<br>PossibleRemedies<br>...**....**<br>*<br>V<br>**........**<br>**. ...**<br>**......... ......**|_16_|
|V.<br>Principal Conclusions<br>.......<br>**....................**|**....**<br>17|
|VI. The Future Role of Irrigation<br>...............|........<br>19|
|AEMS||
|1. Physical Implementation<br>........... | 0 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 3 | 0 | (i)
PROJECT COMNPLETION REPORT
## IKEMYA
BURA IRRIGATION SETTLEMENT PROJE^T (CREDIT 722-KEILOAN 144U9-E)
PREFACE
This Project Completion Report reviews the Bura Irrigation Settlement Project for Which an IDA Credit of US$6.0 million and an IBED Loan of US$34.0 million was approved in June 1977. The original c... | 0 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 4 | 0 | (11)
PROJECT COIMLETION REPORT
8IJA MIRRITiOr'L PROECT (CR 7224KL/UW 144041L)
OSIC DATA SVEET
#### KEY PROJECT DATA
<!-- Start of picture text -->
Acual or Actual s" of<br>Appralsl Current Appraisal<br>Item Exgecttion Estlmto Estimto<br>Project Cost (US$ t) 98.4 105.0 107<br>Credit Amount (... | 0 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 4 | 1 | of picture text -->
<!-- Start of picture text -->
AUMLATIVE ESTIMATED AND ACTUAL DISBURSEMENTS (USS millIon)<br>1. Credit 772 FY78 FY79 FYS0 FY61 FY82 FY88 FY84 FY65 FY86 FY87<br>Appraisal - 5.2 6.0 6.0 6.0<br>Actual - 1.1 2.65 4.08 5.99<br>Actual as X of 21 48 67 100<br>Est.<br>Date of Fina... | 0 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 5 | 0 | (iii)
SJAfF INPU1S (SUfIf Wek*
Tot I FY76 FY77 FY78 FY79 FY80 FY81 FY82 FY6S FY84 FY65 FY66 FY67 -- Prepprosl Appraisal 181.8 70.2 55.1 Neotiatlons 21.2 21.2 Supervsion 224.1 8.6 21.6 28.8 20.6 18.1 82.8 28.7 24.2 83.6 19.3 4.6 TOTAL 419.6 110.4 79.9 21.6 28.8 20.6 18.1 32.8 26.7 24.2 33.6 **10.8** 4.0
#### **MIS... | 0 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 5 | 1 | -h<br>c-h-a-b<br>|-<br>-<br> <br> <br>|
|Supervision<br>**I**<br>Supervision<br>II<br> <br>|10/81/76<br>07/05/79<br>|8<br>8<br>|d-b-c<br>d-a-c<br>|2<br>1<br>F<br>a<br>2<br>F<br> <br> <br>|
|Supervision<br>III<br>Supervision<br>IV<br>Supervision<br>V<br>Supervision<br>VI<br> <br>|12/26/79<br>06/12/81<br>12/01/81<br>07/2... | 0 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 5 | 2 | > <br>|01/03/68<br>422|5<br>1|d-a-t-f-b<br>d|a<br>2<br>_FM_<br>8<br>2<br>FM|
|Supervision<br>VTII<br> <br>|0//68<br>|<br>|<br>f|<br> <br><br> <br>1<br>FM|
|Supervision<br>IX<br> <br>|07/22/68<br>|8<br>|d--c<br>|3<br> <br><br> <br> <br>|
|Supervision<br>X<br> <br>|01/24/64<br>|8<br>|**d-n-c**<br>|8<br>2<br>FUT<br> <br> ... | 0 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 5 | 3 | |
|Suprvision<br>XIII<br> <br>|06/07/86<br>|8<br>|a-b-c<br>|3<br>2<br>FPTP<br>|
|Supervision<br>**XIV**<br>Sii<br>XV|01/10/86<br>08/80/86|2<br>8|d-n<br>d|-<br>4<br>4|
|upervson<br> <br> <br>|<br>|<br>|-a-<br>|-<br><br>|
|Supervision<br>XVI|11/27/86|2|**d-g**|**-**<br>4|
#### OTHER PROJECT DATA
Borrower: Republic o... | 0 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 5 | 4 | Major problem
/ Before 196: 4. After 1998: relating to 1: Improving Avai lrbli-fundo 2: Stationary Project Managemnt 8: Deteriorating Overall **sttus** / F: Financial M: Manaerial T: Technical P: Political 0: Other | 0 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 6 | 0 | (iv)
## PROJECT COMPLETION REPORT
# KENY
BURA IRRIGATION SETTLENENT PROJECT (CREDIT 722-KEILOAN 1449-KE)
EVALUATION SUMNARY
## Introduction
1. Irrigation is one of the few means for expanding the area of cultivable land in Kenya. About 40 percent of the country's irrigable area lies in the Tana river basin,... | 0 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 6 | 1 | and delayed cultivation, and many buildings are threatened by foundation problems.
|4.|The r|easons<br>for this<br>outcome include<br>the followings|
|---|---|---|
||(a)|Low yield.<br>The Kenya Soil<br>Survey regards<br>the presently<br>cultivated soils as only marginally suitable for<br>irrigation. Yields have aver... | 0 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 7 | 0 | (v)
- (c) High costs. Some elements of the project (notably utilities and structures on the main canal) were designed to serve future expansion. Appraisal estimates were outdated within months. Subsequent design changes and rapid inflation contributed to a major escalation of costs.
(d) Financial constraints. Incre... | 0 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 7 | 1 | not cause any real alarms to be sounded. The replicability of settlement at USS 18,000 per settler and the ability of the Kenyan economy to absorb heavy recurring subsidies should have caused more concern (one cofinancier, CDC, withdrew over the latter issue).
6. Cost escalations (65Z) by mid-79 had eroded the econo... | 0 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 8 | 0 | (vi)
introduction of higher value crops; (d) commercial farming in the new area; (e) more secure tenure for settlers; (f) managerial **_autonomy;_** (g) the rationalizing and recouping of costsa and (h) larger tenant landholdings.
Sustainability
8. The current situation is not really sustinable. The management ar... | 0 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 8 | 1 | the need for thorough and reliable technical knowledge before carrying out economic and financial appraisal; or alternatively, of the usefulness of starting agricultural projects as a small pilot phase befere their replication. The recently approved Kenya Rural Services Project, for instance, follows this approach. | 0 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 9 | 0 | PROJECT COMPLETION REPORT
!ENA
BURA IRRIGATION SETTMEMENT PROJECT
(CREDIT 722-UE.LOAN 1449-KE)
I. Background
1.01 The Kenxa highlands are fully exploitedi future growth there must come through intensificttion. The prospects for tainfed crop production in the arid and semi-arid areas that constitute 80 percent... | 0 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 9 | 1 | cotton per ha) were encouraging, although its small size prevented full cost recovery.
1.03 The bura project is situated just south of the equator on the<sup>west</sup> bank of the Tana, 200 km north of the river's mouth.<sup>An alluvial terrace</sup> with an even slope toward the river, the area is connected<sup>to... | 0 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 9 | 2 | <sup>of</sup> sustaining a larger area of irrigation. In 1987 however, for<sup>a period of</sup> two months the river fell to a level that could barely sustain<sup>the Bura</sup> pumping. The management now regards the impounding of water<sup>necessary.</sup> This problem requires further study.
1.04 As part of the f... | 0 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 10 | 0 | -2
irrigation in long furrows. Under the original project design a principal town and 23 villages were to be built for the settlers along with educational, social and administrative facilities and the physical infrastructure (roads, water, electricity) to support an estimated population of 65,000. The project was to ... | 0 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 10 | 1 | was to be financed by the Government of Kenya. CDC soon withdrew from the scheme but additional assistance was negotiated from PINNIDA (US$2 million) for afforeatation, Japan for agricultural equipment and WFP for food to support settlers during an initial period.
1.06 The National Irrigation Board (NIB) was establi... | 0 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 11 | 0 | **-3-**
arrangements created challenges of a kind not previously encountered. In view of its national mandate NIB was nevertheless entrusted with the implementation of the Bura Project provided that its
- (a) appoint additional staff, including the project coordinator;
- (b) employ consultants to complete the des... | 0 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 11 | 1 | yields (2100 kg of seed cotton per ha) have been lower than appraisal estimates (3000 kg) but this has been partly because of managerial problems that resulted in irregular irrigation and delayed planting. Most of the better soils have yet to be brought into cultivation. )saize yields, which have not been systematical... | 0 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv-extractions-meta-tiered
Data-use mention extractions from the World Bank Fragility, Conflict and Violence (FCV) document corpus, enriched by the fine-tuned rafmacalaba/lfm2.5-350M-datause-multitask model (a LoRA SFT of LiquidAI/LFM2.5-350M).
Shape
nested — one row per chunk; each entity in entities[] carries provenance and usage_impact alongside its span.
Configs
| config | rows |
|---|---|
| fcv_pads_east_africa | 862,663 |
| jdc_operational | 2,468 |
| refugee_pads | 23,190 |
| reliefweb | 67,134 |
Fields
- Document trace:
corpus_id,config,pdf_url,title,page,chunk. - Mention span:
mention(long) orentities[].text(nested),label(NAMED_DATA/DESCRIPTIVE_DATA/VAGUE_DATA),score,start,end. - Document metadata (when built with
--with-metadata):project_id,doc_id,document_type,country,sector,language,disclosure_status,document_date,region,topics,themes,authors,abstract, and more, joined fromrafmacalaba/fcv-corpus.
provenance
producer, year, geography, acronym — verbatim substrings of the source text; keys are omitted when the model finds nothing.
usage_impact
data_type: survey, administrative, indicator, database, geospatial, report, otherusage_action: source, analyze, curate, validate, informimpact_label: none, evidence-base, policy, uptakeusage_summary: one-sentence free text describing how the author uses the data.
Attribution coverage
73,481 of 73,481 extracted entities matched an inference row (100.0%). Entities without a match carry only the raw extraction fields (no provenance / usage_impact).
How it was built
data_use/run.py— GLiNER extraction of data mentions over chunked document pages.data_use/infer_multitask.py— LFM2.5-350M multitask model predicts provenance + usage/impact per mention.data_use/attribute.py— joins the inference back onto the extraction chunks on(corpus_id, page, chunk, start, end)and attaches corpus document labels.
- Downloads last month
- 179